I can't get through, the work schedule does not match the information on the website!!!
Major repairs of house 84 began when work was carried out on the technical floor and roof -do not close the hatch, on Saturday the entire entrance to the 3rd floor was flooded in a downpour!!!in the first entrance!The toilet in my apartment is flooded!the roof has not been completed, everything has not been closed !!!
The deadline for work is October 2024 (now it is September 16), absolutely nothing has been done from the work!
There are fleas in the basement , it is impossible to enter the basement
There are still puddles in the entrance to the 3rd floor
And there is simply no one to contact
The website only lists the phone number of the passport holder, who is very unhappy that someone got through to him at all!
Plus, only the passport department-the girls did well!
Minus - today all the water was turned off again without warning! In the machine that washed all the laundry was spoiled. Because after switching on, there is one rust (during the alleged "major " repair, the pipes did not change, one rot). Plumbers are always under the degree. The basement where they are is a mess and stinks. Take action in the end! We collect signatures and call the hotline!!! Street of Brest divisions 19
the yard area is poorly maintained, in particular Highway 14/2, paving slabs are not visible from vegetation, asphalt is destroyed by the root system of the same vegetation, weeds above the fence. It shouldn't be like this.