Convenient location, good design, the error in the design of the LCD is insignificant, an underground parking place, a courtyard in front of the house, everything is thought out, well done
They built very quickly, I'm afraid that it will also fall apart. I did not see construction professionals. They built mostly mardicori. also, workers often quarreled with each other because of money, apparently they do not pay or look badly. Well, if they cheat badly, then they probably build such things so I do not advise it, although the complex is very beautifully built, But not only beauty is needed for housing
They delay the delivery of the house for more than a year. The design of the buildings is modern, but the quality of the construction leaves much to be desired. All the steps leading to the stylobate from the street are insanely slippery, it's easier to break your head in the rain or in winter.
See original · Русский
2
2
Б
Баходир Вот тот об бра
Level 5 Local Expert
September 7, 2024
A very nice courtyard with a fountain is green without cars coming in so that people can calmly let children go to the parking lot in winter, water leaks through the ceiling and there is nowhere to put the car everywhere it flows
Good location, underground Parking, the Russian Embassy is behind the duval, construction is fast, transport accessibility is excellent, I advise Russians to invest
I would not buy an apartment in these houses... The construction is going on under my window... I saw how the cracks between the w / concrete frame and foam blocks were sealed with pieces of foam, which was then blown out by the wind... They covered it up... putty on... and that through these voids the cold will pass into the apartments, and then the tenants will find out!!!... these 13-storey buildings are being built in violation of the requirements of the SNIPS in the immediate vicinity (15-20 m instead of the prescribed 30-50 meters) from nearby 5, 9 and 12 storey apartment buildings... and in general, the developer deceived the residents of the mahalla that he would build a PARK on the site of private houses... yes... only it turned out to be his developer's name - Park Wood...
One friend who was going to buy an apartment in these houses has already refused... including because of the small space for a playground, and they are building about 6-7 high-rise buildings... WHERE CAN HIS CHILDREN PLAY THEN?
And in these houses there are open hinged balconies... and on each balcony there is a tub with a live tree!!! For the shadow, probably!
The construction is being carried out carelessly, there is dirt all around, there is no way to get through. There are slightly arrogant, so-called managers in the sales office.
They are building a new complex, it is not ready yet. Tired of knocking and yelling around the clock, the police arrive for 15 minutes of silence and knock all night. A lot of dust on the car and in the apartment.
The office is well decorated, but out of construction trucks are leaving on wheels and delivering dirt all over the neighborhood.It's disgusting if the construction area is in such a position, it will be bad
During construction, they do not comply with the requirements for maintaining cleanliness, they do not wash cars when leaving, which is why the whole Mahalla is covered in clay and dust