Search
Directions

Аквагаз

Overview
Photos
3
Reviews
1
Features
Rate this place

1 review

By default
Андрей Петрович-Иванович
Level 2 Local Expert
December 23, 2024
There was supposed to be a scheduled boiler inspection at the end of November. The master did not arrive, as a result, in December, the -5s were left without heating. The dispatcher couldn't connect two words. They called everyone, but no one really did anything. When asked why the foreman on duty hadn't arrived, he hung up.
See original · Русский
  1. 1
  2. 2